Electrical panel upgrade cost in Houston

What an electrician charges to upgrade a panel in Houston. This covers the 100A or 150A to 200A upgrade row already on the parent page. CenterPoint Energy drop coordination can take 2-5 weeks.

Job Total cost Labor hours Notes
Main panel upgrade (100A/150A to 200A) $2,400–$4,200 8–12 hours CenterPoint drop 2–5 weeks
Work Permit Cost Lead time
Panel upgrade (100A to 200A) PWE Service Upgrade + CenterPoint $300–$700 2–5 weeks

What this covers

The all-in price covers the new panel and meter base ($550–$1,100 in materials), 8-12 hours of labor at $85–$140/hr, the City of Houston PWE service-upgrade permit ($300–$700), CenterPoint Energy service-drop coordination, and removal of the old panel.

Post-Harvey flood-zone properties in Meyerland or Bellaire often need the meter and panel raised above base flood elevation, which adds $600–$1,800 in mast and weatherhead work. Aluminum branch wiring discovered during the upgrade is a separate scope, typically $2,500–$8,000.

Neighborhood variation

River Oaks, Memorial, and Galleria sit at the high end because of custom-home complexity, 400A services, and building-engineer coordination. East End, Pasadena, and outer Sugar Land tract work sit at the low end. The parent electrician page covers this in detail.

Emergency rates

Emergency calls (nights, weekends, hurricane-season callouts) run $130–$185/hr plus a $125–$200 trip charge with a 2-hour minimum. A typical tripped main breaker or burned panel lug that takes 90 minutes of actual work bills out to $385–$560 because of the trip charge and minimum.

Reserved affiliate slot

Not a quote

This is not a quote. Not an Angi button. Not a recommendation. Get a written estimate. Verify TDLR on tdlr.texas.gov.

Source: copied from parent electrician page, updated May 11, 2026. Method. Do not stamp Houston numbers onto another city.

See also

Data: BLS OEWS May 2024 · Methodology · Updated May 2026